Simon and Schuster

The Challenge:

Manage the construction of a 200,000-square-foot addition to an existing 500,000 square foot warehouse and distribution center.

The Result:

Using specific construction methods including tilt up concrete and very narrow aisle design, led the safe and cost effective ground up construction to double the size of the existing facility, and maximize space.

Size:

197,000 sq. feet

Location:

Delran, NJ

Responsibility:

Project Management & Owner’s Representation

“Eric Gatti and GWG are true professionals. I am currently using them for a 3rd project, and if I have a 4th, I’ll be utilizing them again. Companies with such pride in their work are few and far between.”

Glendale Warehouse
Corporation

“GWG offers a very impressive cross-functional team including regulatory, structural and construction areas. They are able to handle an challenging engineering & design while treating it like their own and looking for areas to optimize. Very impressive!”

Independent Chemical
Corporation