The Challenge:
The Result:
Delivered a custom, design-build approach to realize the client’s vision for a luxurious automotive service experience as an on-site addition to the existing showroom, adding second floor space for storage and future maintenance expansion.
Mapped out a highly precise construction project approach to coordinate the workflow in micro-phases around high volume dealership activities. The project allowed the client to centralize both sales and service which were previously located on separate properties.
Managed more than 30 subcontractors and vendors. Created a detailed project plan to reduce potential loss of utilities during a switchover, minimizing the impact to 90 seconds from a previously estimated three weeks.
Utilized tilt-up construction with a specialty contractor capable of lifting the walls from within the pad, allowing crews to maneuver within narrow spaces inside property lines.</P
The end result is a sleek visual and physical upgrade of the whole property, including a new façade, an energy efficient thermal envelope, and improved site circulation.
60,800 sq. feet
Oakhurst, NJ
Design-build construction management
“Eric Gatti and GWG are true professionals. I am currently using them for a 3rd project, and if I have a 4th, I’ll be utilizing them again. Companies with such pride in their work are few and far between.”
Glendale Warehouse
Corporation
“GWG offers a very impressive cross-functional team including regulatory, structural and construction areas. They are able to handle an challenging engineering & design while treating it like their own and looking for areas to optimize. Very impressive!”
Independent Chemical
Corporation